Brandon Mysliwiec Contact
HOUSE OF
ASH & EMBER
Realistic concept of Staff-Only Bathroom
← Back to the House

Operations · Coming soon

Staff-Only Bathroom

A private facility for the team.

Attached to the staff entrance · approximately 8′ × 18′

Designed around
real possibilities.

The staff-only bathroom is attached to the staff entrance. Its only doorway connects to that entrance; there is no bathroom doorway to the exterior.

Part of the proposed single-story 100′ × 200′ House, with 20-foot ceilings. These are illustrative concepts; the venue is not open and final details may change.

Reserved for staff

Access solely from the staff entrance on its south side

No exterior doorway

See how it all connects.

Concept visualization

Illustrative concept, not a completed facility. Outdoor grounds target April 2028; the indoor House is a separate 2038 vision. Final design may differ.